The after the floor is empty is the deadline that matters. Promising it without the head count is how a four cuts after close slips to the next opening.
Cedar holds the window only when the route can take it. Mobile Barber work is done by the local company, not by the voice on the line.
If the after the floor is empty cannot absorb travel, the callback should say so before anyone rolls.
